
Before — Original Bathroom Layout
The existing bathroom before demolition, with the original finishes and layout still in place.

Before — Original Built-In Bathtub
The original built-in bathtub and surrounding tile before the bathroom renovation began.

Demolition Begins
Removal of the existing bathroom finishes begins, preparing the space for a complete rebuild.

Bathroom Stripped for Renovation
Existing finishes have been removed so the walls, plumbing, electrical, and structure can be properly prepared.

Preparing the New Shower Area
The former bathroom layout is opened up as the new shower area begins taking shape.

Preparing for a Curbless Shower
The floor structure is opened up so the shower area can be recessed below the surrounding bathroom floor—an important step in creating a true curbless, barrier-free transition.
Copyright © 2026 AVCO Tile. All Rights Reserved.
Licensed, Bonded & Insured
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.