
Before the Remodel — The bathroom before demolition began. What appeared to be a normal bathroom was hiding significant water damage beneath the surface.

Demolition Begins — Removing the previous installation to investigate the source and extent of the water intrusion.

Damage Behind the Walls — With the wall opened, hidden deterioration from the failed installation became visible.

Water-Damaged Framing Exposed — Demolition revealed damaged wall framing and areas that needed repair before the bathroom could safely be rebuilt.

Severe Subfloor Damage — Water had penetrated beneath the shower and damaged sections of the subfloor and supporting structure.

New Waterproof Shower System — After structural repairs, the shower area was rebuilt with a properly installed waterproofing system designed to protect the home from future moisture damage.
Copyright © 2026 AVCO Tile. All Rights Reserved.
Licensed, Bonded & Insured
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.